Quote Request

G-Max Girder Assembly Stands Out for Ease of Installation

Watch the how-to video to see the step-by-step installation.

Posted By: Schletter Inc. on February 01, 2018

Share this on → twitter facebook google plus Subscribe

As the premier manufacturer of high-grade steel solar mounting systems, Schletter offers the next generation of racking with G-Max. G-Max’s fixed-tilt construction is ideally suited for utility-scale installations, and exceptional ease-of-assembly in the field and competitive pricing distinguish this American-made steel mounting system from their competitors. In fact, widely recognized for its thoughtful, streamlined design and components that are known for their strength and safety, the G-Max system’s fast and easy installation is so simple that a single person can install the girder, head adapter, and strut without assistance. This week’s Schletter how-to video focuses on the G-Max Girder Assembly’s ease-of-installation, and the following steps outline how simple the clear-cut girder assembly process is.

G-Max Installation: Single Person Girder Assembly steps:

  1. Position the strut onto previously installed lower location bolt.
  2. Position head into upper location bolt.
  3. Install bolt at upper post.
  4. Tighten post bolts using 19 mm socket. The post will pull in tightly.
  5. Mark all the tightened bolts for quality control.
By pre-assembling many components prior to shipment, allowing installers to unfold and connect the structure more easily on site, Schletter is changing the way the solar industry views steel solar mounting products. And with benefits that include increased adjustment capability in the field, increased spans between foundations, standardization and reduction of hardware, and lower costs across multiple installation steps, G-Max is revolutionizing the steel, fixed-filt industry, saving customers both time and money. G-Max also comes with a 20-year limited warranty, providing every Schletter customer with peace of mind.
For other G-Max Installation videos addressing topics such as post installation, purlin layout, purlin alignment, and module and clamp installation, check out www.schletter.us/gmax to learn more.

Source / learn more Youtube

SCHLETTER INC

1001 Commerce Center Drive
Shelby, NC 28150
Call: (888) 608 - 0234
Fax: (704) 595 - 4210
info.us@schletter-group.com

SCHLETTER CANADA INC

3155 Howard Ave, Unit 202
Windsor, ON N8X 4Y8
Call: (519) 946 - 3800
Fax: (519) 946 - 3805
mail.canada@schletter-group.com

Schletter GmbH (DE)

© 2017 Schletter. All Rights Reserved.